Gallery - Photos

Some pictures of work undertaken by the association and its events. Click on an image to make it bigger and to scroll through each of the images.

80080 and 9466 double heading

Photo Credit: Nathan Cooke

Photo Credit: Nathan Cooke

Photo Credit: Nathan Cooke

Photo Credit: Nathan Cooke

1/4

80080 on her test run

Photo Credit: Nathan Cooke

Coaling up ready for proving run.
Coaling up ready for proving run.

Photo Credit: Nathan Cooke

80080 in Wirksworth yard.
80080 in Wirksworth yard.

Photo Credit: Nathan Cooke

Photo Credit: Nathan Cooke

1/5

Cathryn's boiler return to railway 16th March 2021

All back together again!
All back together again!

Photo Credit: Nathan Cooke

Boiler being lifted
Boiler being lifted

Photo Credit: Nathan Cooke

All back together again!
All back together again!

Photo Credit: Nathan Cooke

1/2

Henry Ellison on freight train duties 16th March 2021 

Henry Ellison on ballast freight train duties
Henry Ellison on ballast freight train duties

Photo Credit: Nathan Cooke

Henry Ellison on ballast freight train duties
Henry Ellison on ballast freight train duties

Photo Credit: Nathan Cooke

Henry Ellison on ballast freight train duties
Henry Ellison on ballast freight train duties

Photo Credit: Nathan Cooke

1/2

No.3 Tank and cab lift, 24th February 2021

Santa specials 2020

No.3 in the yard ready for tank and cab refitting.
No.3 in the yard ready for tank and cab refitting.

Photo Credit: Nathan Cooke

Tank being lifted for refitting
Tank being lifted for refitting

Photo Credit: Nathan Cooke

All back together again!
All back together again!

Photo Credit: Nathan Cooke

No.3 in the yard ready for tank and cab refitting.
No.3 in the yard ready for tank and cab refitting.

Photo Credit: Nathan Cooke

1/7
A decorated Henry Ellison
A decorated Henry Ellison

Photo Credit: Nathan Cooke

View of Santa's station from the footplate
View of Santa's station from the footplate

Photo Credit: Nathan Cooke

Santa steam train. Our very own 'Henry Ellison performing duties.'
Santa steam train. Our very own 'Henry Ellison performing duties.'

A decorated Henry Ellison
A decorated Henry Ellison

Photo Credit: Nathan Cooke

1/8

Newly restored embankment opposite platform 1 at Wirksworth - 19th October 2020

GWR Pannier 9466 being unloaded at Wirksworth - 1st October 2020

Unloading 9466 at Wirksworth 1
Unloading 9466 at Wirksworth 1

Photo Credit: Bob Gibbens

Unloading 9466 at Wirksworth 2
Unloading 9466 at Wirksworth 2

Photo Credit: Bob Gibbens

Unloading 9466 at Wirksworth 5
Unloading 9466 at Wirksworth 5

Photo Credit: Bob Gibbens

Unloading 9466 at Wirksworth 1
Unloading 9466 at Wirksworth 1

Photo Credit: Bob Gibbens

1/5

GWR Pannier 9466 being loaded at the

Gloucestershire Warwickshire Railway -

1st October 2020

Aerial view of Wirksworth yard -

16th July 2020

Loading 9466 at the Gloucestershire Warwickshire Railway 1
Loading 9466 at the Gloucestershire Warwickshire Railway 1

Photo Credit: Edward Fletcher

Loading 9466 at the Gloucestershire Warwickshire Railway 2
Loading 9466 at the Gloucestershire Warwickshire Railway 2

Photo Credit: Edward Fletcher

Token exchange at the Gloucestershire Warwickshire Railway
Token exchange at the Gloucestershire Warwickshire Railway

Photo Credit: Edward Fletcher

Loading 9466 at the Gloucestershire Warwickshire Railway 1
Loading 9466 at the Gloucestershire Warwickshire Railway 1

Photo Credit: Edward Fletcher

1/10
View over the steam shed
View over the steam shed

Image taken prior to steam shed roof repair. Photo Credit: Ian Bowley

Looking north
Looking north

Children's play area on the left. Steam shed on the right. Maintenance shed in the distance where the majority of repairs and restoration of rolling stock takes place. Photo Credit: Ian Bowley

Looking south
Looking south

Lower car park at the bottom of the image. Photo Credit: Ian Bowley

View over the steam shed
View over the steam shed

Image taken prior to steam shed roof repair. Photo Credit: Ian Bowley

1/5

Shottle Signal Box in final position

Photo Credit: J Silvester

Photo Credit: J Silvester

Photo Credit: J Silvester

Photo Credit: J Silvester

1/6

No. 3 "Brian Harrison" boiler returned following overhaul - 27th February 2020

Photo Credit: Nathan Cooke

Photo Credit: Nathan Cooke

Photo Credit: Nathan Cooke

Photo Credit: Nathan Cooke

1/10

No. 3 "Brian Harrison" Boiler under overhaul at our external contractor

Front of No.3 boiler at external contractor's workshop. Photo Credit: Nathan Cooke.

Back of No.3 boiler at external contractor's workshop. Photo Credit: Nathan Cooke

Firebox tubeplate with new boiling tubes. Photo Credit: Nathan Cooke

Front of No.3 boiler at external contractor's workshop. Photo Credit: Nathan Cooke.

1/4

No. 3 "Brian Harrison" Boiler Lift Following Boiler Ticket Expiration - 10th December 2019

Lifting the cab roof off
Lifting the cab roof off

Photo Credit: Nathan Cooke

Moving the cab roof
Moving the cab roof

Photo Credit: Nathan Cooke

All in bits and pieces.
All in bits and pieces.

Photo Credit: Nathan Cooke

Lifting the cab roof off
Lifting the cab roof off

Photo Credit: Nathan Cooke

1/19

Model Railway Exhibition 2019

Photo Credit: John Hastings-Thomson

Photo Credit: John Hastings-Thomson

Photo Credit: John Hastings-Thomson

Photo Credit: John Hastings-Thomson

1/7

Reassembling Henry Ellison Following Boiler Repairs

Attaching lifting straps
Attaching lifting straps

Photo Credit: Steve Frampton

A moment's pause
A moment's pause

Photo Credit: Steve Frampton

All back together again
All back together again

Photo Credit: Steve Frampton

Attaching lifting straps
Attaching lifting straps

Photo Credit: Steve Frampton

1/9

Aerial View of New Station Building Under Construction

Photo Credit: Ian Bowley

Photo Credit: Ian Bowley

Photo Credit: Ian Bowley

Photo Credit: Ian Bowley

1/5